Announcement: Our new CyberLink Feedback Forum has arrived! Please transfer to our new forum to provide your feedback or to start a new discussion. The content on this CyberLink Community forum is now read only, but will continue to be available as a user resource. Thanks!
CyberLink Community Forum
where the experts meet
| Advanced Search >
However, if a clip already has color adjustments, the "Apply to All" button does not change the existing settings.


I think that there is one misunderstanding here.

The Apply to All button, as the name says applies the adjustment made in the selected clip, for all the clip's video at the same track.

If you want to set for the selected clip just do not use the Apply to All button.
Lost my PowerDirector 11 Projects After Upgrading to Power Director 13




The way but easy to find any file, use the magnifying glass of the Explorer, select the drive (HD) type the name of a project / magnifying glass.

If you do not remember the name type .pds files will be listed all found PD projects.
Hmm... For me the "Apply to All" button is only affecting the currently selected clip?

Select only 1clip video, make adjustments, click the Apply to All button.

Notes that is shown letter (i) all of the clip's band.

The adjustment is applied only to video, set to photos must make another adjustment.
Here everyone works Color Ajustament, is applied to the entire track.

The White Calibration well.

Note: When using White Calibration (Calibrate button), disables Color temperature and Tint, controls.
Yes, I use AMD video card.
Other users who with Nvidia card may give you more information.
Here at Signature PC did three renderings.
1 - Profile 1920x1080p (28 Mbps) HVE - on
2 - Profile 1920x1080p (28 Mbps) HVE - off
3 - Profile 1920x1080p (12 Mbps) HVE - on
No apparent problem.
Quote: I am looking for a camera shutter transition that is a camera iris closing and opening. I have checked the transitions in PD13, searched Director Zone, google searched and looked at several effects websites, but I can't find anything that is specific to PD. Can anyone help me find or create one?
Karl
PD13, Windows7, 64bit




I use Alpha transitions, they can be modified easily.

Not exactly what you want, but it has a very interesting effect.

Annex a project containing 3 transitions.


I downloaded from DirectorZone, but do not find the link now.
I'm no expert, but I think PD13 makes audio timing based on coincidences of wave peaks, so no matter what FPS and bit rate of the video, in my opinion.A suggestion that perhaps correct the audio first and then synchronizing.
Select the video or audio.

Button Edit Audio / WaveEditor or AudioEditor, of any editing to Ensure the creation of new audio file.

With 1 or 2 audios corrected might solve the problem in some cases.
One option that may work in some cases, select the video.

Button Edit Audio / WaveEditor or AudioEditor, do any editing to ensure the creation of new audio file.
One option that may work in some cases, select the video.

Button Edit Audio / WaveEditor or AudioEditor, do any editing to ensure the creation of new audio file.
I tried using PD workbooks, in my unit, C (SSD) and did not notice any improvement, then returned to use another HD, to relieve my SSD. C:
I had problems after updating, amd-catalyst-15.7-with-dotnet45-win7-64bit.

What but drew attention was the delay to shut down Windows.

Returned to catalyst-omega-14:12, the problem continued.

With doubt made Windows image recovery.

For me catalyst-omega-14:12, Works well here.
Mark - UK


I understand your disappointment with the DVD quality PD13.

I already complained several times about it here.


PD has better quality for file Progresivo so I use this whenever possible, put the DVD in PD is always converted to give Interlace have a picture degradation.


So I use another sofware to create DVD-video.


Example that the PD DVD rendering is below.


I edit one video Sony camcorder, SD (MPEG2 DVD standard) use SVRT not render.

1 - Even for this video that is interlaced, PD will render to lower the bitrate of 9 to 8 Kbps. it has image degradation.

2 - Video thereof Sony camcorder in FullHD, rendered to MPEG2 using the same settings of the original Sony MPEG (In PD) has lower quality.

If I rendering to progressive got better image quality however has blur to motion picture.
Quote: Well, as I mentioned, when I have used SVRT I've experienced a degradation in quality. The other problem with edit, yellow mark, produce and file is that you can't give a filename when produciing. You have to go into Windows file system to rename, and then go out of PD, then back in again. Slow, cludgy process. Yet haven't found anything better. I tried Windows Movie Maker and that is a joke!


I think there was a misunderstanding here.

I did a screen shot that shows how I do
Drag the FADE transition to the beginning and to end of the video clip.
[Quote = teascher] Exatamente. O que precisamos é um programa externo que nos permitiria cortar nossos clipes de vídeo, organizar e renomear conforme necessário antes de importar para PD13. Será que um tal programa existe? !!!!!!!!!!!! [/ Quote]



There is, but I prefer to do everything right in PD.

Even when I'm working on a long project, if necessary cut a epecífico video, add the right in the timeline (area clean)

I edit select with yellow and produce on file, give name and selecting a folder to save.

Return to edit this file is added library.

If you will not use this in this project I delete.

Often I have comings and goings Edit - Producer - Edit

The best use of DP for this process is the use of SVRT.

PD just copy the video file, fast process while maintaining the quality of the original video.
In PD13, I think only one way to do this.
In my opinion is much extra work.
Add the clip on the timeline, use the yellow slider to select the portion you want to save, click the Produce Range button.
A new file with the selected portion will be produced.

Note: Use Intelligent SVRT when possible, to avoid the video recoding.

See more http://forum.cyberlink.com/forum/posts/list/43977.page#227477
Zorikh - Loud "pop" in the early clips


I always realize this POP at the beginning of a project when I have a MP3 audio.

Now seeing his post, I checked here. only giving STOP and PLAY on an MP3 on the timeline have a POP..

For me it has no importance for the video or audio produced, it's perfect.
The PowerDirector folder in this way.

Users \ Your PC \ Documents \ CyberLink \ PowerDirector.

It contains all the material that was created by you, including other previous versions of PD.

You can only choose the folder PD13 still open it and copy only the category of effect you want.

Example: copy the folder MyTitles the external hard drive to the same location on your PC, let the windows will add the files (folders) within the MyTitles folder on your PC.

If you do this for the Cyberlink folder restore all the stuff he had before reinstallation.

If you have doubts, make a copy of Cyberlink folder, for your safety, first of all.
Add the video on the timeline, if have a message, Aspect ratio conflict ... answer No.

Select one clip, directly in the preview screen, rotate and resize image to the size and normal position.

If you have many clips in the same situation, right click with the adjusted clip, choose Copy Keiframe Attributes.

Select all the other clips, right-click, choose Paste Keyframe Attributes.
1.
I have the ability to sample rate convert the standalone recorded audio to 48 kHz from 44.1...should I do this ? Is Multicam's Audio analysis sync doing this on the fly anyway, even if I don't ?
I can not says it, I think so I rarely use MULTICAN, I usually add audio with 44 and 48 on the timeline smoothly, sometimes I use AudioDirector to make corrections if necessary.

2. In what order should I do the video trimming, adding titles, audio analysis sync/record ?
I would start by making audio analysis sync, if you have two or more audio tracks or video with audio on it.

3. Would it be better if I produced the video and audio as a single long file rather than 2 concert halves, then edited this large file afterwards ?
Depending on the complexity of your project, do 2 projects, If want you can join the two projects in one, use the insert project option to add the project 2, so you can save in a single video file.

4. Is audio analysis sync able to operate if the camera audio and standalone audio are of different lengths (ie there might be 10 mins of disparity between them if I stopped the audio recorder but allowed the video camera to continue recording through the interval break of the concert ?
Yes I have done it perfectly, the audio needs to be well readable and be of the same program.

5. Is Power Director able to do the 3.99GB file stitching/combining/joining or do I need to continue using the Panasonic HD Writer file import software ?
There are reports here in the forum that PD leaves gaps in the joint.
Go to:   
Powered by JForum 2.1.8 © JForum Team