I have a project with a video and a music track added.
The music track is longer on my timeline than the video.
When producing the project (my whole timeline, being video + music+titles), the production stops at the video. Normally it must stop at the track music because it is longer. I tried to produce as an AVC (mp4) and AVI same outcome: production stop earlier.
How can I do to produce the whole of my timeline without being shortened?
Thanks.