|
grrr...
|
|
So how can I produce MOV files now?
I need to be able to work with and produce uncompressed MOV files (+Chroma key support).
|
|
The quicktime / MOV option in Produce is missing after the update from PD14 to 15.
I still have Quicktime installed, In the meanwhile I'll try to remove Quicktime and install it again, but if anyone has an idea how to get it back in my produce I would appreciate this.
Thanks.
|
|
Hi
I'm looking for the best way how to do this, but for now I'm hoping for some kind of "lock" I can put on the automation.
The project.
I have a 1 hour video every week again.
So I have a PowerDirector 14 project thats adds some intro and extro stuff and dj drops and so and in orde to export to a Facebook video of 20 minutes.
So the only thing I want to change in the project is to recplace the old 1 hour clip by a new 1 hour clip.
This is what I do now.
Add the new file, drop it on the old fine in the timeline and choose overwrite.
This way it recpects the length of the clip (something less than 20minutes).
But now the clip starts at 00 and not at the time I choose the clip to start.
So now I go to edit the clip and trim.
There I noticed I can click on the slot and then move the scrollbar so the length stays the same but I can choose another part of the clip that suits me better.
Now I can click OK and indeed the clip start at the time I selected.
But the issue is now, that the automation had stayed with the 00 time base.
So my fade in and out are not in the right spot any more. They are at 00 and 20m of the clip and not of the slected part of the clip.
Is there a way to freeze the automation from that clip?
OR should I do this otherwise?
Thanks
|