Announcement: Our new CyberLink Feedback Forum has arrived! Please transfer to our new forum to provide your feedback or to start a new discussion. The content on this CyberLink Community forum is now read only, but will continue to be available as a user resource. Thanks!
CyberLink Community Forum
where the experts meet
| Advanced Search >
Insert transitions without change overall video time
Perifanos [Avatar]
Newbie Joined: Apr 21, 2013 20:00 Messages: 1 Offline
[Post New]
Dear All,

I have noticed that when I insert a transition (like fade) between 2 video sequences, the overall time of the video changes. This has a very big effect in the sync between sound and video and de-sync my output.

Is there something I can do to avoid this time change?

BR
James Dotson
Senior Contributor Location: Tennessee Joined: Aug 24, 2009 20:40 Messages: 3066 Offline
[Post New]
When you apply a fade it overlaps the two clips and does shorten the overall time. You can click the modify button and fade each clip out, or in, and this will not happen, but the fade looks a little different when you do it this way. That is how I do all of my fades now. __________________________________
CORNBLOSSOM
Cranston
Senior Contributor Location: USA Joined: Aug 17, 2007 02:26 Messages: 1667 Offline
[Post New]
Quote: Is there something I can do to avoid this time change?

Hi Perifanos,

As Jamie said. It sounds like you are applying an Overlap type of transition. A quick fix would be to switch to the Cross type transition via the Modify button, or in your Preferences.
There are however some issues with frozen fames sometimes, on long duration transitions. And some folks simply prefer the Overlap type.







[Thumb - transitions003.png]
 Filename
transitions003.png
[Disk]
 Description
 Filesize
36 Kbytes
 Downloaded:
290 time(s)

This message was edited 2 times. Last update was at Apr 21. 2013 21:04

Click here PDtoots for a collection of PowerDirector Tutorials and Tips
borgus1 [Avatar]
Senior Contributor Joined: Feb 27, 2013 00:33 Messages: 1318 Offline
[Post New]
Quote: Dear All,

I have noticed that when I insert a transition (like fade) between 2 video sequences, the overall time of the video changes. <snip> Is there something I can do to avoid this time change?

BR


In addition to other comments here, there are methods for retaining A/B roll sync, which may or may not apply to your production. See http://forum.cyberlink.com/forum/posts/list/28001.page

This message was edited 5 times. Last update was at Apr 21. 2013 21:17

Powered by JForum 2.1.8 © JForum Team