This forces me to continually go thru my library to consecutively add my pictures to the timeline in numerical order. If I want to add the number two to the timeline, I have look way down in the library to find it. It’s not in the number two position (the number 10 is in the number 2 position)
I have tried sorting them in PD via date ,size name and duration, but I can never get them to show 1-128 numerically.
Is there a way to rename the pics so that when imported into PD they show numerically 1-128 in that order?
Thanks
This message was edited 1 time. Last update was at Jan 17. 2011 10:13