If I put camera 1 clips in time sequence in Track 1 and camera 2 clips in time sequence in track 2 can PowerDirector perform some kind of synchronization so that the clips in both tracks more or less align in time? There would be gaps between clips and the clips were taken over a 4-hour window.
I know I can manually do this but it takes a lot of time and was wondering if this was a feature I can utilize.
Thank you