CyberLink Community Forum
where the experts meet
| Advanced Search >
Snippet Speed issues
Reply to this topic
rcohen [Avatar]
Member Private Message Location: Smokey mountains, TN Joined: Oct 10, 2013 21:44 Messages: 58 Offline
[Post New]
When I put a cutaway snippet on a second layer, and then change the running time of that clip either by dragging or by setting the video speed directly (slowmo), the slowed clip (which gets longer) PUSHES ALL OTHER layers to the right, but the amount of the differential.

WHY does this happen and how can I stop that behavior? When I change the length (running time) of a cutaway clip on it's own layer, the clips ahead of that one ON OTHER TRACKS should NOT be affected.

Thanks for the help.

Robert RCMedia Services dot net
Most Anything Digital
Reply
JL_JL [Avatar]
Senior Contributor Private Message Location: Arizona, USA Joined: Oct 01, 2006 20:01 Messages: 5188 Offline
[Post New]
Maybe click the padlocks (left side of timeline for each track) to lock audio and video on the tracks that you don't want to move while adjusting your clip speed on it's own video track.

Jeff
Reply
rcohen [Avatar]
Member Private Message Location: Smokey mountains, TN Joined: Oct 10, 2013 21:44 Messages: 58 Offline
[Post New]
Hi Jeff,

Sometimes the obvious alludes me <blush>

Thanks for the tip...

rcohen RCMedia Services dot net
Most Anything Digital
Reply
Reply to this topic
Powered by JForum 2.1.8 © JForum Team