Announcement: Our new CyberLink Feedback Forum has arrived! Please transfer to our new forum to provide your feedback or to start a new discussion. The content on this CyberLink Community forum is now read only, but will continue to be available as a user resource. Thanks!
CyberLink Community Forum
where the experts meet
| Advanced Search >
PD PhotoCredits V1 use reviewed
tomasc [Avatar]
Senior Contributor Joined: Aug 25, 2011 12:33 Messages: 6464 Offline
[Post New]
See this post: https://forum.cyberlink.com/forum/posts/list/77559.page#post_box_326052 . I have tried this Photo Credits as Theme Designer. More than one can be used end to end if desired. If the Opening and Closing Black slides are checked and used, they add 3.5 seconds to each beginning and end. If videos are used, they act just like still images. The total duration is 1:13:20. The total duration is 1:06:40 if only the Middle 1 sequence is checked on a 60 fps timeline.

The Opening and Closing sequences are optional. The duration on the timeline can be adjusted by trimming the right end to the duration desired. If the duration is too short, then add start another and another one at the end until you get the time duration needed as each is a little over 1 minute long.

I would like to place this comment and review in the thread but will not do so or answer any questions in that thread as it will cause a nested loop. The last user there need to fix his post with Reply to this topic instead of using Reply.
Powered by JForum 2.1.8 © JForum Team