Announcement: Our new CyberLink Feedback Forum has arrived! Please transfer to our new forum to provide your feedback or to start a new discussion. The content on this CyberLink Community forum is now read only, but will continue to be available as a user resource. Thanks!
CyberLink Community Forum
where the experts meet
| Advanced Search >
I need the timeline counter to begin at 00.00 with each separate clip in the timeline
Alex Foster [Avatar]
Newbie Joined: Dec 16, 2016 11:09 Messages: 43 Offline
[Post New]
Problem: I have several small clips in the timeline but need only a small portion of each (which somebody else has preselected for his project), but I can't get PD to display the length of every clip starting at 00.00, it just gives me the total length.

e.g. clip 1 is 1 min and clip 2 30 sec., so when I click into the middle of clip 2 the time shows "1.15 min" instead of "15 seconds", which is what I need.

Who can help here, please? Thanks in advance!
Longedge [Avatar]
Senior Contributor Joined: Apr 28, 2011 15:38 Messages: 1504 Offline
[Post New]
If you change from "Movie" to "Clip" mode then the reported scrubber location changes so that the location within the selected clip is displayed. Is this what you need?
Powered by JForum 2.1.8 © JForum Team