Spartan
This what I do.
1) Add the video clips in a sequence in the time line
2) Play all the clips
3) This gives me an overall idea what needs to be edited out
4) I play again and stop at the 1st clip to be edited and which to be moved to PIP
5) Repeat for all clips.
6) Now the movie begins to take shape
7) Play again and do fine editing
8 ) Insert transitions & effects
9) Play the video clips again to see the effect.
10) Add titles
11) Play the clips again to get the feel
12) look for a suitable music to go with the project and theme
13) Add audio clips
14) Edit audio
15) Add audio fade in and fade out, Volume adjustments etc.
16) Play the whole project again.
17) Then I save and leave it alone for a while
18 ) Re visit the project to see if I can make improvements
19) Once completely satisfied render the video and save it to Harddisk
20) Open the movie next day maybe and play the movie
21) See if if it needs one last trimming.
22) Burn the DVD
I KEEP SAVING PROJECT AS P-1,P-2 AFTER EVERY CHANGE I MAKE JUST IN CASE MY SYSTEM OR PD CRASHES !
This message was edited 2 times. Last update was at May 14. 2009 10:15
PC specs :
OS Windows 10.0 Pro
MB - AS rock Z77 extreme 11
Intel 3770K @ 4.0 Ghz OC
Gskill 32 GB RAM 1800 Mhz
6 TB HDD, SSD bootable
nVidia ASUS GTX 660 Ti
BenQ 22" LCD monitor 1920x1080