Announcement: Our new CyberLink Feedback Forum has arrived! Please transfer to our new forum to provide your feedback or to start a new discussion. The content on this CyberLink Community forum is now read only, but will continue to be available as a user resource. Thanks!
CyberLink Community Forum
where the experts meet
| Advanced Search >
Power Director slowing with lots of edits.
Vonquote [Avatar]
Newbie Joined: Feb 21, 2012 16:47 Messages: 1 Offline
[Post New]
Working on a long music video for a High school marching band year in review.

Been noticing that now the program is missing pictures or effects on playback, even though they are set up to do a fade, dissolve, etc...

should I save and produce the file as a finished product then continue to edit from the end point as a whole new project, if so what is the best video format to save it so i do not lose a generation when adding more pictures and video clips?

Video clips made from HD camcorder, GOPRO and Nikon SLR.

Editing on Lenovo laptop with dedicated 1 gig video card, 16 gig ram, 2.4 cpu

Music track is laid down total time 7:20, edited pics and video to 4:22 so far.

Any help would be fantastic.

Thanks in advance


Vonquote
[Post New]
Quote: Working on a long music video for a High school marching band year in review.

Been noticing that now the program is missing pictures or effects on playback, even though they are set up to do a fade, dissolve, etc...

should I save and produce the file as a finished product then continue to edit from the end point as a whole new project, if so what is the best video format to save it so i do not lose a generation when adding more pictures and video clips?

Video clips made from HD camcorder, GOPRO and Nikon SLR.

Editing on Lenovo laptop with dedicated 1 gig video card, 16 gig ram, 2.4 cpu

Music track is laid down total time 7:20, edited pics and video to 4:22 so far.

Any help would be fantastic.

Thanks in advance


Vonquote


To save a project with all this in the timeline.

Should use the option in the menu File / Pack Projects Materials ...

This will keep everything in a folder.

Note: When editing is created some temporary files.

Note: When editing is created some temporary files.

Example: audio that was edited in WE, photo extracted video, which were used for the project are automatically deleted after 30 days.

This message was edited 1 time. Last update was at Nov 24. 2014 08:29

AMD-FX 8350 / 8GB DDR3
SSD SUV400S37240G / 2-HD WD 1TB
AMD Radeon R9 270 / AOC M2470SWD
Windows 7-64 / PD16 Ultimate
Powered by JForum 2.1.8 © JForum Team