A couple questions:
Can I run the trial version of PD 12 on my machine without stopping PD 10 from running? I don't need them running at the same time, just wondering if I could switch back and forth if needed.
In other words, can multiple version co-exist on the same Windows 8 (64 bit) user.
My machine meets all the specs for both in terms of memory, processor, drive space and video card for both versions.
*****
2nd question: When I upgrade (after confirming PD 12 will do what I need), then can I still have both versions in parallel or does the upgrade remove PD 10? I realize PD is quite large, so I'll remove PD 10 at some point, but probably after I confirm all existing projects make it into PD 12 as expected.
All ideas, links or references also welcomed.
EDIT: I fixed the title. I had a typo in the tile (said "Trail" version. If I can't spell "Trial" I'm sure it looks like I can't handle a parallel install even if it's possible.)
This message was edited 2 times. Last update was at Aug 04. 2014 20:15
Windows 8 (64 bit)
16 GB RAM