Announcement: Our new CyberLink Feedback Forum has arrived! Please transfer to our new forum to provide your feedback or to start a new discussion. The content on this CyberLink Community forum is now read only, but will continue to be available as a user resource. Thanks!
CyberLink Community Forum
where the experts meet
| Advanced Search >
adding multiple projects
VbSparky [Avatar]
Newbie Joined: Aug 11, 2010 11:46 Messages: 6 Offline
[Post New]
I made 3 projects so far , each have different number of time lines
and when i add them back in i get prompted to merge the project into
the timeline, click yes and it blows the existing project out of the timeline.

merge isn't working.

Cap'n Kevin
Senior Contributor Location: Chebeague Island, Maine Joined: Dec 26, 2008 20:22 Messages: 2011 Offline
[Post New]
As far as I know, you can't open and merge multiple projects at the same time to create one big project. I believe the merge refers to merging what you have in the Media Room and not merge with what is on your timeline.

This was possible to do in PD8 but is not possible with PD9.

It may be addressed in subsequent patches....but who knows?

Regards,

Kevin
Check out PDtoots. PowerDirector Tutorials and more! Over 5,000 Subscribers.
George1938
Senior Member Location: Northern & Central New York, Summer & Orlando, FL winter Joined: Jun 20, 2009 04:58 Messages: 162 Offline
[Post New]
This was possible to do in PD8 but is not possible with PD9.

It may be addressed in subsequent patches....but who knows?


Yes I for one would like to see that function restored as I tended to work with multiple smaller projects before producing or burning. At times with PD8 I would copy and then paste the contents of one projects timeline into another project to rearrange into one new combined project.

George Dell Studio XPS 9100
Intel(R) Core(TM) i7 CPU 960 @ 3.20GHz
64 Bit Operating Sytem
12 GB DDR3 SDRAM
NVIDIA GeForce GTX 470 1248 MB Memory

Canon HF S21 & Canon HG21
Powered by JForum 2.1.8 © JForum Team